Nakaminato Factory
The Nakaminato Factory has supported the development of Akasaka Diesels since the 1920s.
This factory is near the Yaizu Port and convenient for installing of fishing boat engines. Furthermore, it is also proximity to the JR Yaizu Station, therefore container cargo transportation is easy.
The Nakaminato Factory has continued to expand over the decades, and now includes property of 30,765 square meters and factory floor space of 21,904 square meters.
The ship parts factories are equipped with state-of-the-art facilities for manufacturing cranks, cams, connecting rods, cylinder liners and other important parts. The assembly factory has test benches for 600 -- 5,000 horsepower class engine.In addition, a multi-story facility keeps a stock of 4,500 different types of parts, allowing us to provide rapid response to any order.
Toyoda Factory
The Toyoda Factory was built in 1962, as a foundry.
In following years, the Nakaminato Factory was too small to handle the growth of 2 stroke engine production, so a large-scale engine assembly factory and large-scale construction machinery production factory were built next to the foundry in 1974.
The Toyoda factory has a comprehensive production system from foundry to machine manufacture, assembly and operation. It's total property is 82,779 square meters includes a foundry that can cast 1,000 tons per month, a machinery production factory with the latest NC-controlled five-face machining equipment, and an assembly factory that can handle 20,000 horsepower class engines.
